Sanitary equipment
Sanitary equipment sourced against the product type, model reference or written specification supplied with the enquiry.
Sanitary equipment supply
Sanitary equipment supply depends on product specification, finish, quantity, compatibility, installation context, supplier availability, manufacturer terms, warranty conditions, delivery requirements, and agreed order scope.
This is a wholesale, specification-led supply service for trade and project customers. It is not a retail bathroom showroom and no consumer retail offer is made.

Product categories
Sanitary equipment is handled as a wholesale supply category for development, fit-out, refurbishment and maintenance programmes, quoted against written schedules rather than displayed ranges.
Sanitary equipment sourced against the product type, model reference or written specification supplied with the enquiry.
Bathroom product requirements for development, fit-out and refurbishment programmes, quoted line by line against the schedule.
Fixture requirements reviewed by specification, dimensions, finish and quantity, including repeating unit types across a scheme.
Associated fittings reviewed alongside the main products so a schedule stays internally consistent.
Repeating plot and unit schedules handled as a single structured requirement rather than as fragmented small orders.
Commercial project requirements reviewed against specification, finish, programme phasing and delivery sequencing.
Supply driven by the written specification and schedule rather than by showroom display or consumer product ranges.
Finish options reviewed against availability and lead time, with comparable alternatives proposed where relevant.
Compatibility considerations raised where product combinations, connection types or installation context may matter.
Specification detail
Sanitary schedules are unforgiving: a finish that does not match, a connection that does not fit, or one long-lead item can hold up an entire phase.
Where a specific model or product reference is specified, it is quoted as written. Where a reference is discontinued, superseded or unavailable, that is reported and a comparable option is prepared for your approval rather than substituted quietly.
Finishes can differ between product families and between batches. Where a scheme depends on visual consistency across units, say so in the enquiry so it can be factored into sourcing and into how the order is phased.
Connection types, dimensions, service positions and installation context affect whether products work together. These considerations are raised where visible, but installation design and verification remain the responsibility of the customer and their appointed installers.
Sanitary equipment suppliers and manufacturers operate under their own terms covering ordering, minimum quantities, returns, damage reporting windows and lead times. Those terms are passed through as issued.
Where a manufacturer warranty applies, it is issued by that manufacturer under their own conditions and typically depends on correct installation, use and maintenance. CoreWood Solutions Ltd does not issue product warranties of its own.
Lead times for sanitary equipment can be long, particularly for specific finishes or specified model references. Indications are shared as supplier-issued, including where they are extended or uncertain.

Project types
Schedules built around repeating unit types are reviewed as a whole, so quantities, finishes and phasing stay consistent across plots. Where a product is unavailable part-way through a programme, an alternative is prepared for approval with the consistency implications stated.
Commercial requirements are reviewed against specification, finish, durability expectations set by the customer, and programme sequencing. Where a specified product carries an extended lead time, that is reported early enough to be useful.
Supply terms
Material supply enquiry
Send the product types or model references, finishes, quantities, installation context, delivery location and programme dates. Supplier availability, compatibility considerations, alternatives and indicative lead times are reviewed before anything is confirmed.