Procurement
Agreed requirements converted into supplier orders under written terms, with availability re-checked at the point of order.
Supply chain & distribution
Supply chain and distribution support depends on supplier availability, logistics capacity, delivery location, access requirements, order quantities, product handling requirements, third-party courier terms, lead times, and agreed delivery arrangements.
CoreWood Solutions Ltd coordinates with third-party suppliers, logistics providers and couriers. It does not claim to own warehousing, depots or a delivery fleet.

Distribution functions
Most delivery problems are avoidable and come down to the same causes: an access constraint nobody mentioned, a lead time nobody re-checked, or a substitution nobody approved.
Agreed requirements converted into supplier orders under written terms, with availability re-checked at the point of order.
Orders progressed with suppliers through to despatch, with issues raised as they arise rather than after the fact.
A single point of written communication with suppliers covering availability, lead times, documentation and despatch.
Delivery planned against the delivery address, access constraints, vehicle suitability and receiving arrangements.
Coordination between suppliers, logistics providers and couriers, each of whom operates under their own terms.
Supplier-issued lead times tracked against the programme, with changes reported as they are received.
Order progress shared as supplier information is received. There is no automated live tracking portal, and none is implied.
Where an ordered product becomes unavailable, a substitution is raised for approval before it is progressed.
Order records and supplier-issued technical documentation collated and shared for the project record.
Access restrictions, offloading method, handling equipment and receiving hours reviewed before a delivery is booked.
Site delivery requirements
A delivery that works on paper can fail at the gate. Reviewing these factors before booking is the single most effective thing a customer can do to protect their programme.
Road width, turning space, height restrictions, weight limits and permitted delivery vehicles.
Whether offloading is by crane, forklift, tail-lift or by hand, and who provides the equipment.
Site opening hours, permitted delivery windows and any local restrictions that apply.
A named person able to receive goods, check the delivery and report any discrepancy promptly.
Where materials will be placed, and whether protection from weather or damage is required.
Long lengths, heavy packs, fragile items and awkward loads all change what is practical.


Substitution control
A substitution that arrives unannounced costs more than the delay it was meant to avoid. Where an ordered product becomes unavailable, the alternative goes to the customer for approval first.
Supply chain transparency
Wholesale supply depends on third parties. Being clear about that from the start is more useful than promising certainty that no supplier can actually provide.
Availability sits with suppliers and manufacturers and can change between enquiry, quotation and order. It is re-checked at the point of order rather than assumed.
Lead times are supplier-issued indications. They are shared as given, including where they are long, variable or uncertain.
Where a specified product becomes unavailable, a substitution is raised for approval. Products are not swapped without agreement.
Comparable alternatives may be proposed alongside the specified product so you can weigh specification against programme.
Technical documentation is issued by the originating manufacturer or supplier. CoreWood Solutions Ltd passes it through; it does not author or certify it.
Technical information is shared as received. It should be reviewed by appropriately qualified specialists before it is relied on.
Pricing is confirmed in a written quotation and is subject to supplier pricing, quantity, specification and validity periods.
Delivery is coordinated with suppliers, logistics providers and couriers, each operating under their own terms and timescales.
Suitability for a specific application depends on intended use, site conditions and project requirements, and is confirmed by the customer and their specialists.
Access, vehicle restrictions, offloading, handling equipment and receiving hours materially affect what can be delivered and when.
Distribution terms
Material supply enquiry
Send the delivery location, access constraints, offloading arrangements, receiving hours and required dates alongside the product requirement, and delivery will be planned around what is actually practical.